Monday, March 16, 2015

May 2015 Visa Bulletin Predictions

For April 2015 Visa Bulletin, please click here: http://blog.mygcvisa.com/2015/03/april-2015-visa-bulletin.html

For the official May 2015 Visa Bulletin, please click here: http://blog.mygcvisa.com/2015/04/may-2015-visa-bulletin.html

Please see May 2015 Visa Bulletin Predictions below (for both Family Based and Employment Based):

Quick Summary:

Family Based:

Family-Sponsored All Chargeability Areas Except Those Listed CHINA- mainland born INDIA MEXICO PHILIPPINES
F1 15AUG07 15AUG07 15AUG07 08NOV94 15FEB05
F2A 01SEP13 01SEP13 01SEP13 15AUG13 01SEP13
F2B 08OCT08 08OCT08 08OCT08 01MAR95 22APR04
F3 22FEB04 22FEB04 22FEB04 01MAY94 22AUG93
F4 08JUL02 08JUL02 08JUL02 08AUG97 22OCT91

Employment Based:

Employment- Based All Chargeability Areas Except Those Listed CHINA- mainland born INDIA MEXICO PHILIPPINES
1st C C C C C
2nd C 01SEP11 01FEB08 C C
3rd 01DEC14 15JAN11 22JAN04 01DEC14 01DEC14
Other Workers 01DEC14 15AUG05 22JAN04 01DEC14 01DEC14
4th C C C C C
Certain Religious Workers C C C C C
5th Targeted Employment Areas/Regional Centers and Pilot Programs C C*
retrogression possible
C C C

If you have not done it, please remember to add or update your I-130/NVC/I-140/I-485 case in the GC tracker: http://www.mygcvisa.com/ tracker/

It would be very useful to understand how USCIS is currently processing cases. It would also help in estimating date movements in future visa bulletin.

We will update this table as we get more data from USCIS. If you are interested, the dates above are based on following data:
  • Latest I-130/I-140/I-485 Processing Statistics (see link on right side) -->

Similar to EB3 category movement, we have added a blog post for EB2 category forward movement. Please click here for FB category.

Next Steps: If priority date is current and

1. If applicant is inside US, they will have to file I-485: http://blog.mygcvisa.com/2013/04/how-to-file-i-485-application.html

2. If applicant is outside US, it will be sent to NVC: http://blog.mygcvisa.com/2013/09/nvc-consular-processing-steps.html

Recommended Reading:


More Reading:

Please click here for latest immigration news or see the right side menu for the latest analysis, news stories and other useful FAQ or USCIS links -->

222 comments:

  1. F2A will move more than the prediction in may bulletin

    ReplyDelete
  2. please do for EB3 India. Please remove backlog from EB3 India.

    ReplyDelete
    Replies
    1. It won't help your EB3 backlog by posting in this blog. Adopt twitter facebook and reach out to your local congressmen with respect to H.R 213, Obama EAD for 140 and GC recapture measures. It will definitely help EB based immigration.

      Delete
  3. OMG, F2A is only 4 weeks advance

    ReplyDelete
  4. Only 4 weeks, I will expect more than that, because In August 2013 VB Sept filer completed your process, It was current then there was retrogress, so they only wait visa avaible in coming months.

    ReplyDelete
  5. This time it will move till Nov 2013, i had paid all the fee and submitted the documents.., pd 24 Nov 2013

    ReplyDelete
  6. Anyone received interview date letter from nvc!! PD OCT 2013

    ReplyDelete
    Replies
    1. I guess it is too early to receive IL from NVC. My PD is Aug-6,2013, and Im sure that NVC will be sending ILs by the end of this month or beginning of next month. Thanks for any update.

      Delete
    2. They send interview letter next month first of week

      Delete
    3. Please update us as soon as you receive your IL... Thanks

      Delete
    4. I will for sure because of my PD which is Aug 6.

      Delete
  7. Hello guys. How long does it uslually take to become current after receiving letter from NVC?

    Thank you

    ReplyDelete
  8. its take 2 to 4 months. Depends on demand

    ReplyDelete
  9. F2A Priority date: Nov22 2013 submitted everything

    ReplyDelete
    Replies
    1. I had paid all the fee and submitted the documents.., pd 24 Nov 2013

      Delete
    2. All the F2A applicants with priority date from Sep 2013 to Jan 2014 please update about your NVC case activities and Interview letter updates.....

      Delete
  10. Any idea about OCT 09 to be current this year ??

    ReplyDelete
    Replies
    1. 2013 or 2014 ?

      Delete
    2. asking about when in 2015...

      Delete
    3. this is for EB2...i ported from EB3 to EB2...date is OCT 09 ..is it going to be current this year in 2015

      Delete
    4. We are asking about your priority date year is it 2013 or 2014 ?

      Delete
    5. It take few year to become current, more than two years

      Delete
  11. Any update abt vermont service center....pd nov2013....f2a India?????

    ReplyDelete
  12. hey guys my priority date is 8th oct 2013 payed my IV fees two weeks ago online and it is showing in process is that normal.
    I have called NVC twice they keep telling me processing is running slow.
    Is anyone else experiencing thses issues.

    ReplyDelete
    Replies
    1. Some time there will be system error, don't worry keep checking it will show paid..., did you submit your DS 260 ?

      Delete
    2. No not as yet i thought the IV fees has to show paid before filling it in. I tried to access it but it not available.

      Delete
    3. Hey guys got through IV fees showing paid now . filling in my Ds 260 Will submit documents tomorrow yayyy

      Delete
  13. My F2A pd is October, 16, 2013. I went for a interview back to August 2014, a week after that I received a letter saying " Your eligible pd had retrogressed and my aplication will be monitored by visa availability Unit in USCI and when current, will be processed to completion". What should I do when my pd is available? Anyone can help me?

    ReplyDelete
    Replies
    1. When your pd current nvc content you .. there are lot of people have same problem ..

      Delete
    2. When your pd current just call USA local embassy.

      Delete
  14. PD: Dec 02, 2013 and Today NVC sent us a letter saying that they have received our IV packet, so we just hopping to be able to pay IV, they are taking more time than usual. Also they explained us we should wait 60 days before we´ll can receive any notification fro them... Thanks!!!!

    ReplyDelete
  15. how long does it takes to become current after applicants receive letter from NVC

    ReplyDelete
  16. hey guys my priority date is 23 november 2013 payed my IV fees two weeks ago online and it is showing NOT STARTED. THEN when it open .
    Before IV FESS I have to submit the document to NVC..??

    ReplyDelete
    Replies
    1. If you paid AOS after week IV fees open for you. If not please call nvc. If you submit document in nvc before pay iv fees it's fine.

      Delete
    2. Pay the IV fees but process is not started yet. Then what to do ..?

      Delete
    3. Call NVC two times a day

      Delete
  17. Some time system error please call NVC

    ReplyDelete
  18. http://www.aila.org/infonet/aila-on-modernizing--streamlining-us-visa-system

    ReplyDelete
  19. All the F2A applicants with priority date from Sep 2013 to Jan 2014 please update about your NVC case activities and Interview letter updates.....

    ReplyDelete
  20. My PD is April 27,2008 F2B ,All Chargeability Areas paid IV and AOS fees and submit documents , NVC had email me to let me know that they have receiced my documents on January 16, 2015 and should give them at least 60 days from date received and I have not heard from them I need to know what I should do since the 60days has passed.

    ReplyDelete
  21. hiii everybody
    my PD Nov 13 2002 in F4 category. so when i receive anything from NVC?

    ReplyDelete
  22. This comment has been removed by the author.

    ReplyDelete
  23. I hope May Vb will move 5-6 weeks n make my PD 09-Sep-13 current. My case was completed on 10Jan-14 n since then I'm waitin fo my IL.

    I hope it will come out good, so that we all can be wid our loved ones.

    ReplyDelete
  24. Hi guys.


    I listened, January PD are completing their cases, it means will be a big jump in next VB.

    ReplyDelete
    Replies
    1. you listened? seriously?

      Delete
    2. I dont think Case Completing means big jump in VB. My case was completed on 10-Jan-14, n m waiting fm 1.5years for my IL.

      Nvc r finishing their task n IL r in hands of Us embassy of our country.

      Sorry if I hurted any1 with this truth bt thas true.

      Delete
    3. Where is ur country?

      Delete
  25. Where is Proof bczz I don't think so

    ReplyDelete
  26. Bro that time visa not available for you

    ReplyDelete
  27. If you visit Visajourney.com you see the track for applicants who is advancing in their cases

    ReplyDelete
  28. After PD becomes current and NVC has sent letter confirming that they have received all necessary documents to complete processing , how long do I have to wait for the visa date.

    ReplyDelete
    Replies
    1. 6 to 8 weeks to receive Interview letter. They will provide you with an interview date in the next month.

      Delete
    2. Thanks for the information.

      Delete
    3. This depends on the workload on U.S Embassy where your interview will take place. No one can give you a specific time frame. Don't let anyone deceives you by telling you 4 to 8 weeks.

      Delete
    4. Thanks for the information the U.S.A Embassy is Jamaica.

      Delete
  29. Hello all...so finally nvc sent letter for futher process which is aos fee and document submision ..pd dec 09 2013

    ReplyDelete
  30. Priority date 10 Jan 2014, today I had paid AOS fee and submitted the documents....

    ReplyDelete
  31. Hey Guys do NVC take 60 working days or just 60 days weekend includeded

    ReplyDelete
  32. NVC takes 60 days to complete the processing of a case

    ReplyDelete
    Replies
    1. Calendar 60 days sometimes less than that

      Delete
  33. After May visa bulletin will be move fast

    ReplyDelete
    Replies
    1. I hope oct 8th become current

      Delete
  34. Not open IV foam what to do. Pay fees on 3 March 2014 .

    ReplyDelete
  35. Hi guys,

    My pd 20 march 2014 still my case not approved from Vermont SC. Pls help me what i can do.

    ReplyDelete
    Replies
    1. mine is also at vermont SC..
      killing movement ..yukk

      Delete
    2. My PD is march 10th, 2014. Don't worry about that. No one for it from Vermont service center since October 2013, and it rally doesn't matter when you get that letter. The only important thing is you PD. But anyway, my guess is we will get our letter probably in 4 or 5 months.

      Delete
    3. Mine took 1year 5months to aprove so dont get worried pd oct 2013

      Delete
  36. Don't worry I heard that they approved Dec 9, 2013 cases .

    ReplyDelete
  37. you are talking about Swati Patel's case right?

    ReplyDelete
  38. When does NVC start sending interview letters to applicants for the embassy appointment?

    ReplyDelete
    Replies
    1. First week of month

      Delete
    2. question?
      Do you get interview letter the month before priority date is current,the month it is current or the month after it is current.

      Delete
    3. The month before.

      Delete
  39. Any news abt vermont f2a india with pd november 2013?? Plz reply..

    ReplyDelete
    Replies
    1. No one give and for that bczz we don't know how they work . I just know they approve case by limitation every year

      Delete
  40. I got an email that they're transferring my case from Vermont to another service center due to Vermont working load. It seems finally they are working on Vermont case numbers. My PD is march 10th 2014

    ReplyDelete
    Replies
    1. Hi aaron that is great. When you got the email.

      Delete
    2. Just this morning. I think they'll do this with other cases in Vermont too

      Delete
    3. hi i check my case status today it seems "Case Was Transferred And A New Office Has Jurisdiction" what it is ment by i am so tensed. my pd 27 march 2014 vermont SC.

      Delete
    4. Apparently we'll get a mail that explains the reason. My guess is they're doing this because of the working load in Vermont sc and I consider thus as a good sign off course. We probably are going to get our approval letters in 2 or 3 months.

      Delete
    5. Hi,
      Me too got mail today regarding case transfer from Vermont.. My PD is July 2014. Lets all hope the best.

      Delete
  41. Hi, I just got email from USCIS that my case got transferred to another office for processing. My PD is January 17, 2014. Is this a good news, about any indication of future movement of Visa Bulletin?

    ReplyDelete
  42. Hi, I just got email from USCIS that my case got transferred to another office for processing. My PD is January 17, 2014. Is this a good news, about any indication of future movement of Visa Bulletin?

    ReplyDelete
    Replies
    1. Apparently we'll get a mail that explains the reason. My guess is they're doing this because of the working load in Vermont sc and I consider this as a good sign of course. We probably are going to get our approval letters in 2 or 3 months.

      Delete
    2. For those of you that have received case transferred emails, it is mostly good news. It appears that the Vermont center has not approved any I-130 petitions in almost an year where as California center as approved them quickly (my I-130 was approved in 20 days in April 2014 from California service center). Looks like NVC is getting ready to send further processing emails to F2A with PD Jan to Mar 2014 applicants. They need the I-130s approved prior to that. If my guess is correct all those I-130 that are being transferred will be approved within next 30 days. Good luck.

      Delete
    3. I received an email that my case is trnfrd to another service center
      Pd 14th may,2014
      Hope will get approved
      How long it will take to be?

      Delete
    4. Maybe it's take 1months

      Delete
    5. This comment has been removed by the author.

      Delete
  43. What it means when it says your case is under jurisdiction??

    ReplyDelete
    Replies
    1. can you read? because it's already explained in comments

      Delete
    2. what is your PD?

      Delete
    3. don't worry it happens to all Vermont cases. You probably will get you approval letter within 1 month.

      Delete
    4. It is the practical authority granted to a formally constituted legal body or to a political leader to deal with and make pronouncements on legal matters and, by implication, to administer justice within a defined area of responsibility

      Delete
  44. Any update about F2A movement in May 2015..

    ReplyDelete
  45. Please update about NVC processing activities priority date with Sep 2013 to Jan 2014

    ReplyDelete
    Replies
    1. Any one with priority date after Sep 2013 got interview letter plz update....

      Delete
    2. Priority date 10 Jan 2014 paid the fee and submitted the documents

      Delete
    3. Big jump in F2A after May visa bulletin.

      Delete
    4. Sep 2013 to Jan 2014 all the applicants had started their NVC process and it is close to complete their case........ In May 2015 or after May 2015 big jump in F2A...

      Delete
  46. Yes u right maybe April visa bulletin will be move 6 or 8.weeks

    ReplyDelete
  47. My pd is Aug_6 ,but I did not receive interview letter yet.
    hope it comes soon.

    ReplyDelete
  48. 29 august 2013 get IL good luck

    ReplyDelete
    Replies
    1. U will get interview letter first week of April don't worry

      Delete
    2. Please, did you get the IL today?

      Delete
    3. 29 august 2013, did u get IL today?

      Delete
  49. Can you give updates?

    ReplyDelete
  50. NVC has started scheduling for May interview. I just read on other blog where some F2A applicants got IL. Their PD's are August 5,6 and 29.
    Please, post updates.

    ReplyDelete
    Replies
    1. Which blog can I have name please

      Delete
    2. http://www.visajourney.com/forums/topic/540177-may-interview-for-f2as/page-5

      Delete
    3. What is your pd

      Delete
  51. http://www.visajourney.com/forums/topic/540177-may-interview-for-f2as/page-5

    ReplyDelete
  52. Hi everybody,
    I just got an IL. PD: Aug 29th 2013, Completed: April 17th 2014. interview: May 18th 2015. Category: F2A :)

    ReplyDelete
    Replies
    1. Thats so great! Congratulations...

      Delete
  53. I-130 (California Service Center)

    Category: F2A (Nigeria)

    2013-08-03:Got Marriedrose.gif

    2013-09-06 : I-130 Sent

    Priority Date: 9th Sep 2013

    2013-09-07: I-130 Received
    2013-09-11: NOA-1

    2013-09-13: NOA1 (Hard copy)smile.png

    2013-10-21 NOA2dancin5hr.gif

    2013-11-04 Case arrived at NVC

    2013-11-24 AOS fee billed and paid

    2014-01-02 AOS package sent to NVC

    2014-01-03 IV fee paid.

    2014-01-06 AOS package delivered (USPS.com)

    2014-01-08 IV DS260 filled and submitted

    2014-01-29 False DS260 Checklistno0pb.gif

    2014-02-18 Case Complete through phone

    2014-02-26 Case Complete Email

    ReplyDelete
  54. 2015 May or June big jump is expected for F2A.......

    ReplyDelete
  55. 11/18/2013 - Received Case Number & IIN by E-Mail

    11/18/2013- AOS fee bil generated & paid

    11/19/2013- DS-261 generated & filled

    11/24/2013 - IV Packet fee bill generated & paid

    12/04/2013 - DS-260 filled & submitted online

    12/07/2013 - AOS and IV Packet sent together

    01/31/2014 - Received AOS Checklist

    02/26/2014 - Received AOS Checklist (this time they asked me to take it to the interview)

    02/26/2014 - Together with the cheklist they wrote that they had finished reviewing my case, so this is my CASE COMPLETE DATE.

    03/04/2014 - CASE COMPLETE E-MAIL

    04/01/2014 - Interview Letter received

    05/08/2014 - Interview date (received the green slip 221g form)

    06/09/2014 - Submitted documents required in form 221g

    06/10/2014 - CEAC status changed to "Ready"

    ReplyDelete
  56. I did not get my IL yet. PD August 6.

    ReplyDelete
    Replies
    1. Call NVC or put an email

      Delete
    2. Check your email regularly

      Delete
    3. I did call NVC this morning. The agent told me that NVC is still processing June 22, 2013 cases now, so I should wait for a visa to be available.

      Delete
    4. Upon calling NVC, I keep checking my email every hour. I hope I get it soon.

      Delete
    5. Wait for a week, you will get your appointment letter within a week

      Delete
  57. Good news for F2A
    September 7,2013 got appointment letter .

    ReplyDelete
  58. Here is link http://www.visajourney.com/timeline/profile.php?cfl=0&id=183244

    ReplyDelete
  59. I have quick question on NOA1 have priority date or uscis recive my i 130 date

    ReplyDelete
  60. hi i check my case status today it seems "Case Was Received At My Local Office" what it is ment by the case transfer to other service center or ?. my pd 27 march 2014 vermont SC.

    ReplyDelete
  61. i recieved an email today to start paying the fees pd february 4,2014..

    ReplyDelete
    Replies
    1. my pd also February 4 2014

      Delete
    2. which country u belongs to and which service centre?

      Delete
    3. india Vermont service center

      Delete
    4. Thats great news..my priority date is 10 feb, f2a india..so i can expect mail soon right?

      Delete
    5. This is a good news, now F2A will move till Jan 2014 in May or April, bcoz Sep 2013 to Jan 2015 applicants are close to complete their case at NVC...

      Delete
    6. I think June vb will big movement in F2A. Some of case NVC take less than 60days to complete the case so .

      Delete
    7. california service center.. canada montreal

      Delete
  62. Guys I had recieved an email today to start paying the fees PD February 4,2014.. So excited...... Good luck every one.....

    ReplyDelete
    Replies
    1. I think June vb will big movement in F2A. Some of case NVC take less than 60days to complete the case so .

      Delete
    2. Same guy before he comment that he received email from nvc to pay fees or different guy

      Delete
    3. This comment has been removed by the author.

      Delete
  63. that's a great news!!!!!!!!!! all F2A people...... hope next VB would be a jump for 2 months

    ReplyDelete
  64. Huge jump is expected for F2A in May or June...

    ReplyDelete
  65. All the F2A applicants please update about your NVC processing activites ...., those who had received Interview letter please update with your priority date....

    ReplyDelete
  66. I think most of the F2A applicants from Sep 2013 to Jan 2014 are close to finish their NVC process..., those who had finished plz update...

    ReplyDelete
    Replies
    1. Nvc sent IL who pd August 2013 ...maybe we have to wait for next week for September fillers.

      Delete
    2. Priority Date with Oct 2013 to Jan 2014 any one there who had finished their NVC process ?

      Delete
    3. What happen with you guys please update about your case help other people who had waiting for long time give them hope that they will heard good news soon. Keeping update on blog.

      Delete
  67. File transfer from vsc to local service center on 24 march 2015....pd nov 2013...

    ReplyDelete
  68. May visa bulletin priority date is either 1st or 8th sep 2013

    ReplyDelete
    Replies
    1. I strongly believe is going to be 8th of September, 2013

      Delete
    2. This comment has been removed by the author.

      Delete
    3. Good lets see b'coz none of SEP 2013 filler got IL for me one more month to go feeling so sad PD SEP 11th 2013

      Delete
  69. Hi
    How long is NVC taking right now to complete cases.
    I sent all documents on the 23rd march they sent a letter saying they got it.
    My priority date is 8th october 2013 .
    I hope my priority date is current in MAY OR JUNE.

    ReplyDelete
    Replies
    1. Did you submit IV package ?

      Delete
    2. yes i did submit it.
      Thats why the sent a letter say the recieved it on 23rd of march

      Delete
  70. 60days or less than 60days maybe your pd current will be in June visa bulletin

    ReplyDelete
  71. Priority Date with Oct 2013 to Jan 2014 any one there who had finished their NVC process ?

    ReplyDelete
  72. No updates from any one.., guys update about your case activities it will help others and will get a hope

    ReplyDelete
  73. Did any one after Sep 2013 completed your case at NVC ?

    ReplyDelete
  74. No one update bczz they are selfish guys when they need help than they write something. When they need help than they write like they are crying like baby . Like baby need milk.

    ReplyDelete
  75. PD SEP 11th 2013 waiting for IL no luck in May 😟😟 another 1 month to wait😥

    ReplyDelete
  76. Friends, can you explain to me what is the rest of the procedure till I can get my green card?

    my case is under F2A category, my PD is march 2014, I got my NOA1 (I-130 application receipt notice) and (NOA2 = I-130 approval notice), so what is my next steps? when I should expect to have the interview or when I should pay the fee, etc
    Thanks in advance

    ReplyDelete
    Replies
    1. U have wait for nvc welcome letter maybe u will get after May visa bulletin release

      Delete
  77. Lets see 2moro I hope u will get IL soon . Please let us know. We are community.

    ReplyDelete
  78. This comment has been removed by the author.

    ReplyDelete
  79. I think Nvc dint sent IL in last 2 days, due to weekend. N they wl start sending ILs from today again.

    I'll update you guys if I receive it. My PD is 09-Sep-2013. CC date is 10-Jan-2014.

    ReplyDelete
  80. Lucky one right now are AUGUST 2013 fillers for SEPTEMBER 2013 one more month to go!!!!

    ReplyDelete
  81. Hi Amazon. First of all I want to tell you thank you very much for sharing very important information for all applicants. Therefore, I have a question. My PD is January 06, 2014 and I already am in USA. What do you think ?? when will my application become CURRENT??? thank you very much.

    ReplyDelete
  82. My pd nov 2013 f2a India.....i130 not approved yet... I130 transfer from vsc to local office on 24 march 2015...Anyone with same situation????

    ReplyDelete
  83. This comment has been removed by the author.

    ReplyDelete
  84. Hi Anyone please send me the AOS page access link .

    ReplyDelete
  85. https://ceac.state.gov/ctrac/invoice/signon.aspx

    ReplyDelete
  86. Called NVC NO IL for SEPTEMBER 2013!!!!

    ReplyDelete
  87. Called NVC no IL for sep 2013 so sad

    ReplyDelete
    Replies
    1. My pd is August 6, but I still did not receive my IL yet. However, some folks whose pd's are 28,29 and 30th August got their IL. Honestly, I do not understand how NVC proceed the IL scheduling.

      Delete
    2. Don't worrt don't take any tension u will surely receive if not today then tomorrow b'coz all the August 2013 fillers will get IL soon!!!

      Delete
    3. Thanks for your reply. I was willing to send an inquiry email to NVC about my IL, but I will wait for couple days to see whether I will get it.

      Delete
    4. Your welcome some embassy starts giving IL in 1st week of every month so just wait for 1 week .........

      Delete
    5. You should try calling instead, NVC answers emails after like a month.

      Delete
  88. This guy with PD Oct 28th 2013 that already got his case completed on March 30th 2015.
    This is a good news, will be a big jump on June VB.
    Here is his timeline http://www.visajourn...cfl=0&id=171709

    ReplyDelete
    Replies
    1. Link is not working, send it once more

      Delete
  89. Anyone with priority date in February got welcome letter from NVC?

    ReplyDelete
  90. Omg....is it true Nvc r nt scheduling interviews for Sep13 filers? M gonna screwed up with this waiting time.

    Pls let us know if any1 wid Sep'13 PD got IL.
    My PD:09-Sep'13
    CC: 10-Jan'14

    ReplyDelete
    Replies
    1. I called nvc they said they didn't send any IL To SEP 2013 fillers so we have to wait one more month

      Delete
    2. Each time I call NVC, the agent does not want to give further information about May VB or IL. The agents keep saying they are processing June 22 visa.
      Please, how did you know that they are not sending IL to Sep fillers?

      Delete

Comment Posting Tips:

1. To estimate when priority date can be current, please see this GC Calculator: http://www.mygcvisa.com/calculator

2. View or add your I-130/I-485/NVC case to GC Tracker: http://www.mygcvisa.com/tracker

3. You can browse or post new questions in GC Forum: http://www.mygcvisa.com/discuss


Comments posted above will only appear in this blog post. Comments posted below will appear across all blog posts:

comments powered by Disqus